General Information

Other Name/Nickname:-
Architectural Style:-
Project Start Date:-
UPRN:-
Phase:In Construction
Commercial/Domestic:-
Official Building Website:http://52limestreet.co.uk/
History:

-

-

Companies

Listing

Toggle
  • WRBC Development Ltd, Client
  • KPF, Architect
  • Arup, Engineer
  • Skanska, Main Contractor

Significant Individuals

Listing

Toggle

Technical Information

Size

Gross internal area:58000.00m2
Net internal area:-
Height (top of project):190.00m
Height (top floor):-
Floors above ground:35
Floors below ground:2
Parking spaces (cars):-
Parking spaces (bicycles):-

Cost

Design costs:-
Construction costs:-
Total capital cost:-

Structure

Structural Material:-

Equipment

Lifts (passenger):-
Lifts (goods):-
Top speed of lifts:-
Escalators:-

Materials

-

Procurement

Type of procurement:-

Purpose

Sector:Office
Apartments:-
Hotel rooms:-
Tenancy:-
Domestic/Non:-
Planning Type:-

Terms

Terms:-
Rent:-
Price:-
Minimum floor size:-
Maximum floor size:-

Operation

Days of Operation:-
Hours of Operation:-

Energy

Design Energy Use:-
Total Energy Use:-
CO2 Emissions:-
Waste disposed:-
Water Use:-
Operating costs:-

EPC Information

Project EPC rating:-
EPC Number:-
Energy Efficiency Rating:-
Potential efficiency rating:-
Main Heating Fuel:-

DEC Information

Project DEC:-
DEC Number:-
DEC Rating:-
Total Energy Use:-
CO2 Emissions:-
Water disposed:-
Water used:-

Utility Providers

Gas:-
Water:-
Electricity:-
Other:-

Awards

-

Heritage

Listed:-

Ratings

BREAM Rating:-
LEED:-
NABER Rating:-
Greenstar:-
Ska Rating:-

Validation

Validated by owner:No

Trivia

Trivia Posted December 10th, 2014

52 Lime Street is a new City of London office tower that was awarded the first-ever Design Stage certificate under the BREEAM UK New Construction 2014 scheme. The Lime Street tower will be approximately 190m tall, with 35 floors of offices above ground and mezzanine levels, with an additional two basement and two roof plant levels. The tower will provide approximately 400,000 sq. ft. of office accommodation and floor space is arranged around a side core located to the south of the building, which maximises available floor area, limits solar gain and offers views of London to the north, east, west and south west. Public space created by the development will include a ‘square’ of approximately 11,000 sq. ft. which will complement the existing precinct between the Willis Building and Lloyd’s of London. The tower, which is due for completion in 2017, will be the new European headquarters for global insurance company, W. R. Berkley Corporation, who will occupy one fifth of the building, bringing all of its London employees together. The remaining office space will be available for lease. Key facts •BREEAM rating: Excellent (Interim stage rating) •Score: 76.9% •Size: 37,000 m2 NIA •Stage: In construction •BREEAM version: BREEAM NC 2014 Overview of environmental features •25% operational carbon reduction achieved without compromising the architectural vision of the building, which included a high level of transparency •All upper floors achieved Green Guide rating of A+ for embodied impacts, partially delivered through minimising the use of concrete •45% reduction in potable water use compared to a typical tower, achieved through the use of low-flush and low-flow sanitary ware •Support for sustainable commuting with the incorporation of secure, covered storage in the building for 370 bicycles as well as 172 lockers and 36 showers •Biodiverse green roof, incorporating native wildflower species The BREEAM assessment Within the Design Stage assessment, the building scored full marks in the Transport category and performed highly in the Energy (76.2%), Water (77.8%) and Management (77.8%) categories. Building services The building services design for 52 Lime Street takes a hybrid approach, providing centralised wet and power services with on-floor air handling plant. The office areas will be conditioned by a wet fan coil air conditioning system. On floor air handling units, connected to louvres integrated into the facade of the building, will supply fresh air to the rear of each of the floor fan coil units. Perimeter fan coil units will be four-pipe (heating and cooling). Internal zone fan coil units will be cooling type only. Chilled water for cooling will be generated using a combination of roof-mounted cooling towers and chillers. The chilled water will supply cooling demands throughout the building via risers complete with connections at each load point. Each of these connections will be provided with a heat meter to enable consumption monitoring and recharging to tenants where appropriate. Gas boilers will provide low temperature hot water for heating. This will supply the heating load centres via risers and local connections in a similar manner to the chilled water connections. Green strategy 52 Lime Street’s BREEAM achievements are the result of strong collaboration from the outset between the architects, building engineers, façade engineers and client to develop a design that would deliver significant operational carbon savings without relying on extensive renewable energy add-ons. The design’s 25% operational carbon savings have been achieved via an efficient mechanical design, a high performance building envelope and low energy lighting. The passive approach to the building’s energy strategy was crucial. www.breeam.org

Trivia Posted December 10th, 2014

52 Lime Street will be the European headquarters of the global insurance business W. R. Berkley Corporation

Trivia Posted December 10th, 2014

W. R. Berkley Corporation will occupy around 20% of the building, whilst the remainder will be available to lease.